top of page
vs logo for website #2.png

Welcome to our Gallery

Screenshot_24-11-2024_11837_www.loopnet_edited.png

4-8 Franklin st.

The installation of 9 high luxury apartments. All done with pre-finished hard wood. The apartments are selling for $750,000 - $1.2m.  

Allston MA.

Screenshot_24-11-2024_105354_chinburg_edited.jpg

the Dover Courthouse

Dover NH.

The conversion of the Dover Courthouse into a 49 Unit apartment building. Done all in LVP, ceramic tile, and carpet. Containing lofts to a few apartments and a gym.

cordwainer_edited.jpg

the cordwainer

Norwell MA.

New construction of a Memory health care center for senior living. A 2 story building with 3 tiled fireplaces. Multiple backspashes and fully tiled bathrooms. Apartements range in size of 350sqft - 530sqft.

Screenshot_30-11-2024_105912_images1.loopnet.com.jpeg

225 Foxborough

Foxborough MA.

The fit up of 2 office spaces located on the 2nd floor and 1st. All done with carpet tile and a selected amount of rubber and LVP. Done for ITSolutions who occupy the 2nd floor space.

Screenshot_30-11-2024_155632_www.bing.com.jpeg

THE  SAINT JAMES PLACE

Cambridge MA.

46 High Luxury apartment building. Ranging from 700sqft - 2,000sqft units. All hardwood floors with porcelain tile in the bathrooms and a glass backsplash in the kitchen.

vs logo for website_edited.png

605 concord

Cambridge MA.

Project currently in Progress

Screenshot_24-11-2024_172730_www.zillow.com.jpeg

9 Everett ST.

Allston MA.

New construction of 9 high quality apartments. All done in engineered wood that was prefinished. A very fast and simplistic project.

union 346.jpg

Union 346

Somerville MA.

Built from the ground up a 96 Unit Aprtment building. All units done fully in LVP with ceramic tile in the bathrooms, as well as a backsplash. Including a large fireplace and a beautifully designed lobby.

3 Hawkins St. site photo.jpg

3 Hawkins

Somerville MA.

Same owners and architect as Union 346 Project. Also, a new constructed apartment. Identically designed as Union 346 with a slight alteration of building size and layout.

Screenshot_24-11-2024_17454_www.bing_edited.jpg

157 everett st.

Allston MA.

New Contruction apartment with 8 Units, all done in prefinished hard wood. We were only involved in the installation of the wood floors. Very quick and simplistic project.

Screenshot_30-11-2024_12726_www.zillow_edited.jpg

16 elmer st.

Cambridge MA.

Ongoing renovation of a 20 unit apartment building. Switching to LVP and a newly design kitchen with a tiled backsplash. Including new fully tile bathrooms.

Photos not yet available

Screenshot_29-12-2024_104525_www.google.com.jpeg

the bradford

Belmont MA.

New Construction of a 112 Unit apartment. Done for the Toll Brothers on 3 separate occasions. A very well-planned project consisting of 3 separate buildings done in 3 phases.

Screenshot_3-1-2025_103250_www.bing.com.jpeg

Ellie Mental health

Quincy, MA.

Renovation of an office space on the 3rd floor of 1515 Hancock Street. Turned into a space for Ellie Mental Health. All done in carpet tile with LVT in a breakroom

vs logo for website_edited.png

Culinary Arts Studio

Cambridge, MA.

Culinary arts studio, located at the Saint James Place in Cambridge MA.

bottom of page